Acrel co, Ltd.
+8615000360686
Kontakte nou
  • Konpayi: Acrel co, Ltd.
  • Adrès: NON. 253, Yulv Road, JiaDing Zone, Shanghai, Lachin
  • Faks: +86 21 6915 8302
  • Kontakte: Aliness Sun.
  • Mobil: +8615000360686
  • Imèl:aliness@acrel.cn
  • Whatsapp: +8615000360686
  • Wechat: ali15000360686

Acrel bay solisyon pou lokal olenpik ivè Beijing yo

Jan 17, 2022

1.Apèsi sou lekòl la

The Beijing Winter Olympics will be grandly opened on February 4, 2022. This is a major landmark event at an important historical node in my country. It is an important opportunity to show the country's image, develop the country and inspire the national spirit. As the grand event draws nearer, as an important basic condition for hosting the Olympic Games, the construction of the venues for the Beijing Winter Olympics has always attracted much attention, and the stable and reliable operation of the power supply and distribution system of the venues is the top priority.
The outdoor environment of the site is relatively harsh, and the temperature is as low as minus 20 degree . In order to ensure reliable power supply, each headquarters conducts power supply support capability tests according to the power supply duties, and tests the power supply tasks, main power supply and self-provided emergency power supply of each venue. Supply situation, operation of important loads, relay protection action, emergency response plan, spare parts, logistics support, etc. Acrel Electric provides solutions for intelligent monitoring of distribution boxes and environmental regulation in boxes for the Winter Olympics, and conducts online real-time management of power supply and power protection equipment such as cable branch boxes, ATS power boxes, and UPS power boxes. The edge computing gateway collects the electrical data, temperature and humidity, condensation, contact temperature and other data inside the indoor and outdoor power distribution cabinets and automatically adjusts them to achieve good operating conditions, realizing intelligent monitoring from the UPS to the low-voltage switch at the end of the venue for the Winter Olympics , to provide emergency support in a timely manner and improve the reliability of power supply.
 
640

 2.System structure
Sistèm nan ka divize an twa kouch: kouch aparèy jaden an, kouch kominikasyon rezo a ak kouch jesyon platfòm la.
Field device layer: including DTSD1352-4S2D-MK, DTSD1352-4S2D, ARTM-24, WHD46-33-C,WHD20R-22-C, ARTU-KJ8 and other signal acquisition equipment, used to collect electrical operation in indoor and outdoor distribution boxes Parameters, electrical contact temperature, ambient temperature and humidity in the box, condensation, smoke and other data, and can be automatically controlled by the built-in logic of the ANet-2E4SM intelligent gateway to adjust the temperature and humidity to maintain a good operating environment inside the distribution box.
Network communication layer: including ANet-2E4SM intelligent gateway. The gateway actively collects the data of the field device layer equipment, and can perform protocol conversion, data storage, and upload the data to the local touch screen and the designated server port through the 4G network. Temperature and humidity control equipment. 
Jesyon platfòm: yon gwo platfòm pou jesyon enèji nan olenpik ivè yo.
640 (1)
 
3.Solisyon
Sit la sitou kontwole ak kontwole twa kalite bwat distribisyon, ki gen ladan bwat branch kab, ATS ekipman pou pouvwa otomatik switch bwat ak bwat ekipman pou pouvwa UPS, asire operasyon ki estab ak nòmal nan bwat distribisyon nan anviwònman frèt grav. Gen plis pase 500 bwat distribisyon twa kalite sa yo enkli nan siveyans aleka, ak solisyon yo pou bwat distribisyon diferan yo tou yon ti kras diferan.
3.1 Konfigure Envantè Aparèy
640 (2)
 
3.2 Aplike fonksyon
Siveye paramèt elektrik yo nan sikwi bwat branch lan.Lè tanperati a nan bwat la twò ba, pouse siyal alam la epi kòmanse chofaj la.Konektè kab sou alam tanperati.
Kondansasyon detekte yo kòmanse chofaj ak vantilasyon alam lafimen Socket pouvwa ekipman pou estati deteksyon.Adopte IEC60870-5-104 pwotokòl yo telechaje nan platfòm Winter Olympic pidevan jesyon enèji atravè rezo direksyon APN.
640 (3)
 
 
3.3 Konfigure Envantè Aparèy
5


3.4 Aplike fonksyon

Lè tanperati a nan bwat la twò ba, pouse siyal alam la epi kòmanse koleksyon tanperati konektè kab chofaj la, sou alam tanperati.Se alam kondansasyon detekte ak vantilasyon chofaj aktive Alam lafimen ak tanperati ak imidite. Adopte pwotokòl IEC60870-5-104. pou telechaje sou platfòm jesyon enèji pidevan Winter Olympic atravè rezo direksyon APN
 
3.5 Konfigure Envantè Aparèy

6


3.6 Aplike fonksyon
Lè tanperati a nan bwat la twò ba, pouse siyal alam la epi kòmanse chofaj la Entèn sou tanperati alam Chofaj kondansasyon Batri pake alam nòmal Alam echèk varyateur. Adopte pwotokòl IEC60870-5-104 pou telechaje nan platfòm jesyon enèji pidevan Winter Olympic atravè APN. rezo direksyon
7

 
4. Sou-antretyen sit
The opening of the Winter Olympics is imminent. In order to ensure the normal operation of the on-site power distribution system, Acrel arranged for engineers to maintain on-site and provide technical support for winning the tough battle of power protection for the 2022 Beijing Winter Olympics.
Acrel has been deeply involved in intelligent power distribution for many years, and currently more than 14,000 solutions are running all over the country. The company has accumulated a lot of experience from terminal sensors, edge computing gateways to cloud platforms, and provides data support and solutions for weak links in power distribution systems in various environments to improve power supply reliability. Acrel will help this time with practical actions. The Winter Olympics were a complete success. 

8

9


Pwodwi ki